Basement finishing

How long does it take to finish a basement?

The short answer

Most guides put a basement finish at about 3 to 8 weeks for a 1,000 square foot basement, and up to 16 weeks when there are bathrooms, a kitchen or a lot of rooms. Alpha Homes usually takes a bare 2,000 square foot basement from concrete walls to finished in about 3 weeks.

What the big guides say

Ask three websites and you get three answers. Here is what the biggest home cost guides say about a basement finished by a pro crew.

SourceHow longGood to know
Angi (2026)3 to 8 weeks, 5 on averageBased on a 1,000 sq ft basement. Angi says 2 weeks or more than 12 both happen.
HomeGuide (2026)4 to 16 weeksDepends on the number of rooms, the size and the scope.
This Old House (2026)About 6 to 12 weeks in all1 to 2 weeks to plan, 4 to 8 weeks to build, 1 to 2 weeks to finish.

Notice the size. Angi's numbers are for 1,000 square feet and it says bigger basements will likely take longer. The Alpha Homes number further down is for a basement twice that size.

Where the weeks go

A basement is built in steps, and most steps have to wait for the one before it. Angi breaks a 1,000 square foot basement down like this:

StepDays
Framing the walls3 to 6
Wiring, plumbing and heating ducts (the "rough-in")3 to 7
Insulation1 to 3
Drywall, tape and mud, with dry time5 to 16
Doors and trim2 to 6
Paint2 to 4
Flooring2 to 4
Fixtures and last touches1 to 5

Drywall is the longest step. The mud has to dry before the next coat goes on, and you cannot rush drying.

What slows a basement down

  • Waiting on other trades. Angi says the more subcontractors a job uses, the more likely it is to add days or even weeks.
  • Waiting on inspections. Work stops until the inspector signs off on each stage.
  • Bigger scope. A full bathroom plus a kitchen can add several weeks, according to Angi. So can custom cabinets.

Permits and inspections in Sandy

Sandy has its own permit for this job, called a basement finish permit. You apply online through the city's Cityworks portal, with plans for the layout, wiring, plumbing and heating.

Two Utah rules help keep things moving. Since November 2025, state law says a city must finish plan review on a home project within 14 business days, after a 3 business day screening. And Sandy says state law gives the city 3 business days to do a building inspection. Inspections need to be booked at least 24 hours ahead, Monday to Friday, 8 a.m. to 3 p.m.

A permit is not a step to skip. Sandy charges an investigation fee equal to the permit fee for work done without one.

How Alpha Homes finishes one in about 3 weeks

A bare 2,000 square foot basement, with nothing framed yet, usually takes Tanner's crew about 3 weeks. That is faster than every range above, so here is how.

  • The plan and permit come first. The paperwork is handled up front, so the crew does not stop and wait on it.
  • Inspections are booked ahead. Each one is on the calendar before the crew needs it.
  • The subs are lined up before day one. Electrical, plumbing and heating show up in order, not when they get around to it.
  • One crew runs the whole job. You have one person to call: Tanner.

A bathroom, a wet bar, a kitchen or a walkout door adds time. Tanner gives you a real schedule at the walkthrough, before you sign anything.

"Tanner and his team were amazingly quick and completed both of our bathrooms in only two weeks"Anna Kinne, Google review

Finishing a basement in Sandy?

See how Alpha Homes plans, permits and builds a Sandy basement, with real jobs and reviews.

Basement finishing in Sandy

Keep reading

Our work and reviews

The work, and what people said about it.

Real Alpha Homes jobs, next to real Google reviews, copied word for word.

Basement bathroom: Updated basement bath
Basement bathroomUpdated basement bath
Google review

"Tanner with Alpha Homes Construction did an exceptional job finishing our basement. From start to finish, the process was smooth, professional, and stress-free. ... The space looks elegant, well thought out, and far exceeded our expectations. Tanner communicated clearly, showed up when he said he would, and treated our home with care and respect."

TC
Talmage Conrad
Basement finish
Bathroom remodel: Freestanding tub and walk-in shower
Bathroom remodelFreestanding tub and walk-in shower
Google review

"Tanner did a great job remodeling two bathrooms for us in a second home. ... Tanner and his team were amazingly quick and completed both of our bathrooms in only two weeks - several days before his projected finish date."

AK
Anna Kinne
Two bathrooms
Built-in entertainment center: Custom shelving and fireplace wall
Built-in entertainment centerCustom shelving and fireplace wall
Google review

"Great job on a complete remodel. Tanner was able to keep timelines (very rare for a contractor) and provide a fantastic finished product!"

D
Derek
Complete remodel

More from Google

4.8 from 65 reviews
Kitchen remodel: Quartz counters and dark cabinets
Kitchen remodelQuartz counters and dark cabinets
Google review

"Tanner and his team are amazing! As a realtor I’ll never refer my clients to anyone else, they are responsive, efficient, fairly priced, and best of all their work is top notch. Would highly recommend them for any job you need done!"

JM
Josh Mondale
Realtor referrals
Stairs: New treads and iron railing
StairsNew treads and iron railing
Google review

"Tanner and his crew were great to work with. We’re getting ready to list a house and he helped with a few different projects. Everything was done beautifully and I’d recommend him for sure."

TM
Traci McClean
Pre-listing projects
Double vanity: Marble tops and arched mirrors
Double vanityMarble tops and arched mirrors
Google review

"Tanner has been my "go to" in big jobs and small. He always makes himself available and is always willing to help no matter what the job. From full house painting, to joist repair to sealing up windows or quickly detecting a gas leak, he and his team will do it all and do it with expertise and professionalism. Thrilled to recommend Alpha Homes Construction."

JJ
Jojo Joslin
Many projects
Built-ins: Cabinets, open shelves and tile backsplash
Built-insCabinets, open shelves and tile backsplash
Google review

"Tanner and team are quick on the draw. His turn around time is amazing. And he is always responsive to your needs. He stands behind his quality. Good folks to do business with."

DM
Davide Michael
Project
Kitchen and dining: Dining table by shuttered windows
Kitchen and diningDining table by shuttered windows
Google review

"Tanner was/is professional, helpful, nice, honest, and communicates well about what is going on. He goes out of his way to make sure the job is done correctly and in a timely manner. Also mindful of others priorities and time. I appreciate all his help!"

AW
Aubrey Williams
Project
Bathroom remodel: Glass shower and marble counters
Bathroom remodelGlass shower and marble counters
Google review

"Have had Tanner do work on my personal home, and business locations. Very communicative, and great to work with. Highly recommend!"

JE
Jono Ebert
Home and business

Questions

Good questions.

Can a basement really be finished in 3 weeks?
A bare 2,000 square foot basement, with nothing framed, usually takes Alpha Homes about 3 weeks. A bathroom, kitchen or walkout door adds time, and you get a real schedule at the walkthrough.
What is the slowest part of finishing a basement?
Drywall. Angi puts it at 5 to 16 days for a 1,000 square foot basement, because the mud has to dry between coats.
How long does a Sandy basement permit take?
Utah law says a city must finish plan review on a home project within 14 business days, after a 3 business day screening. Sandy then has 3 business days to do each inspection.

Want your basement done this season?

Tell us about your basement. Tanner will set up a walkthrough and give you a schedule and a price in writing.

Get My Price or call Tanner at (801) 598-2172
Call Tanner(801) 598-2172 Get a Price